This parking lot was in need of major repair. Over 4 tons of patching and 1000 ft of crack filling was included to remove the failing asphalt surface and stop water erosion of the subgrade. The sub-grade underneath the asphalt patches had to be repaired and compacted as well. Two-coats of PCMT Sealcoating material was applied and the parking lot markings were painted.